In Vechta (Germany), our technicians successfully replaced an existing spiral bulkhead with a Variopool submersible bulkhead pool with dimensions of 12.5 x 0.75 x 1.3 meters. The pool in question is a wave pool in a overflow pool, a type of installation that we regularly install in Germany.
With this type of pool, it is essential that the water level can be adjusted by tens of centimeters in a short time. Within a few minutes, the overflow pool transforms into a wave pool and vice versa. The water flow takes place entirely through the overflow bulkhead, which ensures efficient and reliable operation of the system.
The collaboration with the pool team was particularly pleasant. Thanks to good coordination and expert execution, the project was successfully completed and the customer is very satisfied with the final result: a functional and aesthetically high-quality pool bulkhead.





Related projects
-

Movable floor in hellevoetsluis (netherlands)
Zwembad De Eendr8 in Hellevoetsluis, a modern and sustainable sports complex with various pools, movable floors and extensive facilities for young and old alike.
-

Two movable floors in Sint-Truiden (Belgium)
Movable pool floors floors in PP steel construction in the swimming pool in Sint-Truiden, allowing multiple target groups to use the pools at the same time.
-

Duo movable floor, arnhem (netherlands)
Mobile DUO movable floor measuring 20 x 10 meters, recently installed by Variopool at Sportcentrum Valkenhuizen.
-

Two movable floors, a vertical bulkhead and a disabled platform in winchester (england)
Variable Movable pool floor and tiltable bulkhead from Variopool at the Winchester Sport & Leisure Park, applied for maximum flexibility, accessibility and efficient energy use.
